10times
22 Apr 2021Ended

Beyond civil engineering: Digital advancements for Hinkley Point C

AboutSpeakersExhibitorsReviewsPhotos

Estimated Turnout

100 - 500
Delegates
Based on previous editions

Editions

Apr 2021

Frequency

Not Available
Claim event to edit details

A presentation on 3D digital advancements at Hinkley Point C - the first new nuclear power station to be constructed in the UK for a generation. When .. Read more simple de-clashing of reinforcement on site can lead to days or weeks of delay, and when you have over 12 million reinforcement bars and over 100,000 embedded items, how do you secure your programme and assure buildability? Hinkley Point C is the first new nuclear power station to be constructed in the UK for a generation and will be capable of generating 7% of the UK’s energy needs. The complex and stringent design requirements for these seismically qualified structures lead to very congested and complex reinforcement details. Working alongside the main civil work contractor, BYLOR, Atkins have been able to implement a number of digital strategies that have improved the overall productivity of the design and construction. Atkins have developed an in-house design software, ContourRC, to automatically post process the finite element results to produce an optimised design, the use of 3D reinforcement models then allows the design and construction requirements to be visualised, assessed and validated in a 3D environment.

  • Followers
  • [ Users who have shown interest for this Event ]
Kingshuk Mukherjee

Kingshuk Mukherjee

Student at NIT Durgapur

Kolkata, India
  • Share your Experience
  • Organizer
Logo Follow Company

Institution of Civil Engineers

UK339 Total Events / 36 Upcoming Events

More Events From The Organizer